Deyacolor EOOD is issuing a public invitation to tender to select a contractor for the construction and commissioning of a 50 kW photovoltaic power plant to generate electricity for its own use. The photovoltaic power station comprises the supply and installation of the following assets/equipment necessary for the station to function as a single operational system:
- photovoltaic modules with a total installed capacity of 50 kW;
- a hybrid inverter for the photovoltaic modules with a rated power of 50 kW – 1 pc.;
- an electricity storage system (battery) with a rated power of not less than 50 kW – 1 pc.
Applicants must submit their tenders exclusively via the Information System for the Mechanism (ISM) – the Unified Management Information System for the EU funds in Bulgaria 2020 (UMIS 2020).

This document has been produced with the financial support of the ‘Competitiveness and Innovation in Enterprises’ 2021–2027 programme, co-financed by the European Union through the European Regional Development Fund. Full responsibility for the content of this document lies with ‘Deyacolor’ EOOD, and under no circumstances may it be assumed that this document reflects the official position of the European Union or the Managing Authority.
Package of documents for participation in the procedure for selecting a contractor for the project: DOWNLOAD HERE
